If track isn't complete, or if any heavy machinery still needs to get in and out this will not happen. That's the only thing that could stop this idea.... It could work well otherwise.
But, I hope they decide to risk it and just keep it shut.
X Sector Refurbishment
- Kenzie2012
- Member
- Posts: 634
- Joined: Wed Feb 29, 2012 5:00 pm
- Location: Leeds
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
- Rollercoasters4Life
- Member
- Posts: 112
- Joined: Sun Jun 26, 2011 3:34 am
- Location: Crewe, Cheshire
By March, personally I could see all construction of track finished. This would only leave landscaping, paving, theming, electrics and testing. Which I would presume some of it would already be under way, especially the electrics..Kenzie2012 wrote: If track isn't complete, or if any heavy machinery still needs to get in and out this will not happen. That's the only thing that could stop this idea.... It could work well otherwise.
But, I hope they decide to risk it and just keep it shut.
- Kenzie2012
- Member
- Posts: 634
- Joined: Wed Feb 29, 2012 5:00 pm
- Location: Leeds
Right, so what I've just said there is "IF" any of that is left.
I too would very much hope all the big stuff is done... Lets say we turn into Antarctica for another 3 weeks though, that really isn't going to happen.... Even the slightest delay could push things back enough to mean I the spider let say is still being placed come opening week which will no doubt means cranes and transport vehicles all over the place.
I too would very much hope all the big stuff is done... Lets say we turn into Antarctica for another 3 weeks though, that really isn't going to happen.... Even the slightest delay could push things back enough to mean I the spider let say is still being placed come opening week which will no doubt means cranes and transport vehicles all over the place.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
- Liam-AltonTowers
- Member
- Posts: 425
- Joined: Wed Jun 06, 2012 5:14 pm
- Sam198
- Member
- Posts: 695
- Joined: Wed Oct 24, 2012 9:15 pm
Enterprise would go up in 2 days...Liam-AltonTowers wrote: Hang on a minute, does this mean the X-Sector will be open from March till May or will it be closed along with The Smiler construction. Also when do you think the Enterprise replacement will be finished by?
We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
- Liam-AltonTowers
- Member
- Posts: 425
- Joined: Wed Jun 06, 2012 5:14 pm
- Kenzie2012
- Member
- Posts: 634
- Joined: Wed Feb 29, 2012 5:00 pm
- Location: Leeds
I disagree completely Liam, I don't think it will make a huge amount of difference.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
- Owen
- Member
- Posts: 2552
- Joined: Tue Mar 20, 2012 5:25 pm
- Location: South East
What do you mean by "would go up in 2 days" I don't understandSam198 wrote:Enterprise would go up in 2 days...Liam-AltonTowers wrote: Hang on a minute, does this mean the X-Sector will be open from March till May or will it be closed along with The Smiler construction. Also when do you think the Enterprise replacement will be finished by?
We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
- Kenzie2012
- Member
- Posts: 634
- Joined: Wed Feb 29, 2012 5:00 pm
- Location: Leeds
The Enterprise is a very easy ride to build.... That can be rebuilt and up ready for testing in to days of work.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
- Sam198
- Member
- Posts: 695
- Joined: Wed Oct 24, 2012 9:15 pm
Enterprise is a travelling model, it's designed to be put up and taken down with ease. This one is currently in a far more deconstructed state than would usually be necessary in order to allow for transportation; however it still really wouldn't take very long at all.thillmad wrote:What do you mean by "would go up in 2 days" I don't understandSam198 wrote:Enterprise would go up in 2 days...Liam-AltonTowers wrote: Hang on a minute, does this mean the X-Sector will be open from March till May or will it be closed along with The Smiler construction. Also when do you think the Enterprise replacement will be finished by?
We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
- Owen
- Member
- Posts: 2552
- Joined: Tue Mar 20, 2012 5:25 pm
- Location: South East
I understand this,but I mean 2 days from now or was this just an estimateSam198 wrote:Enterprise is a travelling model, it's designed to be put up and taken down with ease. This one is currently in a far more deconstructed state than would usually be necessary in order to allow for transportation; however it still really wouldn't take very long at all.thillmad wrote:What do you mean by "would go up in 2 days" I don't understandSam198 wrote: Enterprise would go up in 2 days...
We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
- sque132
- New Member
- Posts: 1
- Joined: Mon Dec 10, 2012 2:56 pm
- Location: Cambridge
- Contact:
Hi first post on here
seen all the images AT have recently posted...
is there any word on the Enterprise re-theme? Wouldn't it be amazing if it contained a similar colour scheme to the smiler!
I'd love it to look like one of the spirals/eyes in the logo! Just a thought
seen all the images AT have recently posted...
is there any word on the Enterprise re-theme? Wouldn't it be amazing if it contained a similar colour scheme to the smiler!
I'd love it to look like one of the spirals/eyes in the logo! Just a thought
Born This Way Ball 08/09/2012
- samham
- New Member
- Posts: 16
- Joined: Mon Nov 26, 2012 7:14 pm
I love this idea!sque132 wrote: Hi first post on here
seen all the images AT have recently posted...
is there any word on the Enterprise re-theme? Wouldn't it be amazing if it contained a similar colour scheme to the smiler!
I'd love it to look like one of the spirals/eyes in the logo! Just a thought
- Kenzie2012
- Member
- Posts: 634
- Joined: Wed Feb 29, 2012 5:00 pm
- Location: Leeds
Thats a good idea, but i really hope they don't do it.
Something like that is going to spoil the feel of the area, the flats are there to be subtle additions to back up the big rides and the area. Putting some form of decoration on Enterprise will start to turn the area into Smiler-Ville.
Something like that is going to spoil the feel of the area, the flats are there to be subtle additions to back up the big rides and the area. Putting some form of decoration on Enterprise will start to turn the area into Smiler-Ville.
Last edited by Kenzie2012 on Tue Jan 22, 2013 12:26 am, edited 1 time in total.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
- Kenzie2012
- Member
- Posts: 634
- Joined: Wed Feb 29, 2012 5:00 pm
- Location: Leeds
Yeah i think so.... keep it nice and simple.
Black, Black, Black with Grey Cars and possibly a big of green lining those Cars.
This is all.
Black, Black, Black with Grey Cars and possibly a big of green lining those Cars.
This is all.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”