The Smiler - Construction Discussion
- Creative05
- New Member
- Posts: 4
- Joined: Tue Dec 11, 2012 9:16 pm
- Location: Melbourne
Have we seen two trains on the track at the same time yet? Or are they still testing one at a time?
- Aidan Lowe
- Member
- Posts: 1778
- Joined: Fri Feb 15, 2013 4:08 am
Rob over at TowersStreet posted a photo update earlier today which doesn't seem to have been mentioned. Visit this link.
It looks like there are magnetic fins added to the second airtime hill, thought they were there before but seems a new addition.
They have also dug 2 trenches around the shop and pavement, if the breakdown during the press opening was power related it does seem they have placed some kind of box, what it is or what it does I do not know, hope someone can shed some light on it.
I personally think they are opening it too soon it doesn't seem it's quite ready just yet, they should of just gone for Friday 30/31st and given them extra breathing space. But as always they are a company out to make money and I guess the kids breaking up and a bank holiday is too good to miss whether its functional or not, it will draw the punters in.
It looks like there are magnetic fins added to the second airtime hill, thought they were there before but seems a new addition.
They have also dug 2 trenches around the shop and pavement, if the breakdown during the press opening was power related it does seem they have placed some kind of box, what it is or what it does I do not know, hope someone can shed some light on it.
I personally think they are opening it too soon it doesn't seem it's quite ready just yet, they should of just gone for Friday 30/31st and given them extra breathing space. But as always they are a company out to make money and I guess the kids breaking up and a bank holiday is too good to miss whether its functional or not, it will draw the punters in.
Last edited by Aidan Lowe on Wed May 22, 2013 1:09 am, edited 1 time in total.
Formerly known under username Andy Mc
- hursty
- Member
- Posts: 950
- Joined: Sat Jan 02, 2010 11:18 pm
That box will be a 'basic' cable joint. Resin filled for insulation and probably rated at around 15/20kW (maybe)Mabalzich wrote: They have also dug 2 trenches around the shop and pavement, if the breakdown during the press opening was power related it does seem they have placed some kind of box, what it is or what it does I do not know, hope someone can shed some light on it.
Not sure if that's a new installation - or whether they've dug down to inspect/replace.
- bbooth2
- New Member
- Posts: 38
- Joined: Fri Sep 25, 2009 5:12 pm
have we had any recent confirmation to say that it WILL acctualy be open and functioning tomorrow, obviously I know they said it opens tomorrow it just seems abit quiet on construction side of things, not seen any videos of a car going around since the press breakdown.
- MatthewR1990
- Member
- Posts: 183
- Joined: Thu May 03, 2012 10:38 pm
- Location: West Bromwich
As it stands. Their website, adverts and marketing team are all still saying Thursday. So unless there Is a statement declaring otherwise. Then it is still thursdaybbooth2 wrote: have we had any recent confirmation to say that it WILL acctualy be open and functioning tomorrow, obviously I know they said it opens tomorrow it just seems abit quiet on construction side of things, not seen any videos of a car going around since the press breakdown.
West Bromwich Albion until I die! I bleed blue and white.
- jbuckton18
- New Member
- Posts: 5
- Joined: Tue Apr 16, 2013 1:03 pm
- Location: Manchester
Should be open tomorrow. Probably getting everything ready and fault tolerant for tomorrow They have done all the testing they need to do so thats why you havent seen anything go roundbbooth2 wrote: have we had any recent confirmation to say that it WILL acctualy be open and functioning tomorrow, obviously I know they said it opens tomorrow it just seems abit quiet on construction side of things, not seen any videos of a car going around since the press breakdown.
Some say they've seen angels, Ive seen The Smiler - That's enough
- Dan
- Member
- Posts: 2339
- Joined: Tue Jun 23, 2009 9:08 pm
I was looking through their tweets and they said "we hope to have it open for 10am however with all rides this is subject to availability"bbooth2 wrote: have we had any recent confirmation to say that it WILL acctualy be open and functioning tomorrow, obviously I know they said it opens tomorrow it just seems abit quiet on construction side of things, not seen any videos of a car going around since the press breakdown.
Presuming all faults have been ironed out then hopefully tomorrow will go smoothly.
- Hitch
- Member
- Posts: 98
- Joined: Mon Nov 05, 2012 5:30 pm
- Location: North Wales
- Contact:
I think the reason they wont run it today is because of all the themeing they have to do on the floor, if they sent the trains around it would delay them to much.jbuckton18 wrote:Should be open tomorrow. Probably getting everything ready and fault tolerant for tomorrow They have done all the testing they need to do so thats why you havent seen anything go roundbbooth2 wrote: have we had any recent confirmation to say that it WILL acctualy be open and functioning tomorrow, obviously I know they said it opens tomorrow it just seems abit quiet on construction side of things, not seen any videos of a car going around since the press breakdown.
TowersTimes will be live from the Alton Towers Resort today, covering all the build up for the resorts latest rollercoaster. And remember to stay tuned tomorrow as we finally bring you live coverage from the opening of The Smiler!
http://www.towerstimes.co.uk/live/
http://www.towerstimes.co.uk/live/
- jbuckton18
- New Member
- Posts: 5
- Joined: Tue Apr 16, 2013 1:03 pm
- Location: Manchester
Fantastic !Danny wrote: TowersTimes will be live from the Alton Towers Resort today, covering all the build up for the resorts latest rollercoaster. And remember to stay tuned tomorrow as we finally bring you live coverage from the opening of The Smiler!
http://www.towerstimes.co.uk/live/
Some say they've seen angels, Ive seen The Smiler - That's enough
- Richardio123
- New Member
- Posts: 25
- Joined: Tue Jan 17, 2012 4:45 pm
- Location: Manchester
OoohDanny wrote: TowersTimes will be live from the Alton Towers Resort today, covering all the build up for the resorts latest rollercoaster. And remember to stay tuned tomorrow as we finally bring you live coverage from the opening of The Smiler!
http://www.towerstimes.co.uk/live/
Signature Pending.. ;D
- Aidan Lowe
- Member
- Posts: 1778
- Joined: Fri Feb 15, 2013 4:08 am
Via TowerTimes Live:
Trains on either lift hill.
Trains on either lift hill.
Formerly known under username Andy Mc
- Barty
- New Member
- Posts: 9
- Joined: Sun May 05, 2013 4:42 pm
- Location: Nottingham
Sorry to go back to this but looking at the pictures from towersstreet of those 4 cameras on the walkway just before the vertical hill do look a though they will do something. They seem to be positioned such that each camera looks at one of the 4 seats in the row of the cars which would suggest they could easily take photos of your face and put them on the marmaliser since the train moves so slow just before the lift Hill
- arE Y0u R3AdY t0 Sm1Le?
- Member
- Posts: 60
- Joined: Thu Apr 11, 2013 5:25 pm
- Location: Not really sure....
Is it just me or have some of those pictures not fully loaded... The 3rd, the inside of the shop, the stafforshire not and in other..... ( sorry off topic )Mabalzich wrote: Rob over at TowersStreet posted a photo update earlier today which doesn't seem to have been mentioned. Visit this link.
It looks like there are magnetic fins added to the second airtime hill, thought they were there before but seems a new addition.
They have also dug 2 trenches around the shop and pavement, if the breakdown during the press opening was power related it does seem they have placed some kind of box, what it is or what it does I do not know, hope someone can shed some light on it.
I personally think they are opening it too soon it doesn't seem it's quite ready just yet, they should of just gone for Friday 30/31st and given them extra breathing space. But as always they are a company out to make money and I guess the kids breaking up and a bank holiday is too good to miss whether its functional or not, it will draw the punters in.
I'm worried looks like there's a lot of little things to do, ie queue line and refilling the path, on too little time to do so...
Jealousy, turning saints into the sea
Swimming through sick lullabies
Choking on your alibis
But it's just the price I pay
Destiny is calling me
Open up my eager eyes
‘Cause I'm Mr. Brightside
Swimming through sick lullabies
Choking on your alibis
But it's just the price I pay
Destiny is calling me
Open up my eager eyes
‘Cause I'm Mr. Brightside
- RubyGaga
- New Member
- Posts: 47
- Joined: Sun Feb 24, 2013 1:27 pm
- Location: Lincoln (UK)
Look around for 50% off coupons first, then you could get both!!RCandrew wrote: This is a bit off topic, I know, sorry! But it is to do with my visit to ride the smiler and this is a general forum! So;
http://s11.postimg.org/juaki4u2r/image.jpg
Which one of these fast tracks is best to buy? I have only been a few time so don't know what the queues are normally like in Early July, but which of these two is best(has longer normal queues?)
Quick answer please that's all I need thanks!
Me and my girlfriend are planning on getting both
- ManiaMuse
- New Member
- Posts: 26
- Joined: Wed Sep 22, 2010 4:50 pm
Plenty of other coaster projects have opened with work still ongoing. Thirteen they even left the scaffolding up...arE Y0u R3AdY t0 Sm1Le? wrote:Is it just me or have some of those pictures not fully loaded... The 3rd, the inside of the shop, the stafforshire not and in other..... ( sorry off topic )Mabalzich wrote: Rob over at TowersStreet posted a photo update earlier today which doesn't seem to have been mentioned. Visit this link.
It looks like there are magnetic fins added to the second airtime hill, thought they were there before but seems a new addition.
They have also dug 2 trenches around the shop and pavement, if the breakdown during the press opening was power related it does seem they have placed some kind of box, what it is or what it does I do not know, hope someone can shed some light on it.
I personally think they are opening it too soon it doesn't seem it's quite ready just yet, they should of just gone for Friday 30/31st and given them extra breathing space. But as always they are a company out to make money and I guess the kids breaking up and a bank holiday is too good to miss whether its functional or not, it will draw the punters in.
I'm worried looks like there's a lot of little things to do, ie queue line and refilling the path, on too little time to do so...
It won't be 100% finished tomorrow, but it will be 99% there in the grand scheme of things.
- arE Y0u R3AdY t0 Sm1Le?
- Member
- Posts: 60
- Joined: Thu Apr 11, 2013 5:25 pm
- Location: Not really sure....
The scaffolding is part of th13teens theming I know werid, I thinks it that it's ment to say people have discovered a new grave type thing and are excavating it....ManiaMuse wrote:Plenty of other coaster projects have opened with work still ongoing. Thirteen they even left the scaffolding up...arE Y0u R3AdY t0 Sm1Le? wrote:Is it just me or have some of those pictures not fully loaded... The 3rd, the inside of the shop, the stafforshire not and in other..... ( sorry off topic )Mabalzich wrote: Rob over at TowersStreet posted a photo update earlier today which doesn't seem to have been mentioned. Visit this link.
It looks like there are magnetic fins added to the second airtime hill, thought they were there before but seems a new addition.
They have also dug 2 trenches around the shop and pavement, if the breakdown during the press opening was power related it does seem they have placed some kind of box, what it is or what it does I do not know, hope someone can shed some light on it.
I personally think they are opening it too soon it doesn't seem it's quite ready just yet, they should of just gone for Friday 30/31st and given them extra breathing space. But as always they are a company out to make money and I guess the kids breaking up and a bank holiday is too good to miss whether its functional or not, it will draw the punters in.
I'm worried looks like there's a lot of little things to do, ie queue line and refilling the path, on too little time to do so...
It won't be 100% finished tomorrow, but it will be 99% there in the grand scheme of things.
And I agree another N:ST moment here I think and I'm going in July with a school trip so hopefully i will get the finished product :moj
Jealousy, turning saints into the sea
Swimming through sick lullabies
Choking on your alibis
But it's just the price I pay
Destiny is calling me
Open up my eager eyes
‘Cause I'm Mr. Brightside
Swimming through sick lullabies
Choking on your alibis
But it's just the price I pay
Destiny is calling me
Open up my eager eyes
‘Cause I'm Mr. Brightside