Page 27 of 65

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 10:19 am
by Owen
ATI wrote:I spy airtime!
Not sure I'd count on that being the case here :lol

What seems to be the queue line shop has also begun construction...

Image

Image

Credit to TowersStreet.

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 12:24 pm
by 118hazaman
The real question is: How long will it take before the queue line shop becomes a set of vending machines?  :-k

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 12:27 pm
by jackf1tz
Approximately 15 seconds.

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 3:26 pm
by Nickolai
:lol :lol
Realistically though I believe it will be for the 2019 season.

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 4:42 pm
by Ben-
Robert W wrote:Towers Street always has good photos! For me, it's the roofing that makes it obvious that the ride should be in Gloomy Wood...
Thats what i was thinking! I would also love a new ride in gloomy wood, and a coaster is perfect!
and Oh my God! SW8 is going to have an early release (hopefully!).

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 5:14 pm
by Adam.W
These pictures confirm that Universal Rocks will almost certainly be working on the theming structure, at least.
Image
Image
Credit to Theme Park Guide

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 7:36 pm
by lewis97
Theme Park Worldwide have posted a couple of photos showing today's progress on the pre-show building as well as the addition of bents in the vicinity of the queue-line shop.

Image

Image

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 7:38 pm
by Nickolai
Maybe the architecture and design of the preshow building may give some clues? It may be a little early on to tell.

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 7:42 pm
by lewis97
I do think the height of the actual pre-show area is curious, and will no doubt be utilised by whatever show sequence is inside. From the plans, the lower section appears to contain the baggage area and somewhere to hold guests prior to entering the pre-show.

Image

Re: SW8 Construction Discussion

Posted: Fri Aug 04, 2017 9:13 pm
by xylyx
I waa on park today and grabbed some pics though all prettu similar to what's been posted already. I did manage to grab a close up of the wire mesh thats on the theming structure Image

And marvelled (without pics) at the banking thats going on further down the first drop. Looks like youre going to be swayinf drom side to side.

Re: SW8 Construction Discussion

Posted: Sat Aug 05, 2017 8:19 pm
by T0mPr1ce
The preshow building structure looks very church-y

Re: SW8 Construction Discussion

Posted: Sat Aug 05, 2017 10:34 pm
by Robert.W
T0mPr1ce wrote:The preshow building structure looks very church-y
Now you've pointed that out, it really does!

Re: SW8 Construction Discussion

Posted: Sun Aug 06, 2017 3:00 pm
by Owen
Here's a sneak peak from TPG of the theming element. To me it looks like wood or spiky rocks...

Image


Also this image popped up in a discord server showing the turn around half way through the course...

Image

I'm sure you have noted the complete lack of banking on the turn which would suggest a low speed at this point, hopefully this is for a reason or another banked section will be added on top, rather than the coaster slowing down... :nervious:

Re: SW8 Construction Discussion

Posted: Sun Aug 06, 2017 3:19 pm
by Justin
There is a further update from Theme Park Guide due soon. Now you mention it, Owen, it looks more like bent wood panels and not so much like the spikes originally seen!

Re: SW8 Construction Discussion

Posted: Sun Aug 06, 2017 4:59 pm
by Justin
Theme Park Guide has updated their construction page with lots of images from the construction of SW8. I've posted a few of the theming structure below.

Image

Image

Image

Image

Image

Re: SW8 Construction Discussion

Posted: Sun Aug 06, 2017 6:03 pm
by Capt.Barnacles
Considering those black parts are see through, they're not wooden planks... most likely wire mesh wrapped ready for rendering, so at this point, could still be anything.

Re: SW8 Construction Discussion

Posted: Sun Aug 06, 2017 6:16 pm
by PhNx Survivor
Thoses covers that state Alton (followed by a number), I would not be surprised if that is track work.

Also the look of that roof tiling, and the new structure being built along with the new see through mesh? I can't place my finger on what this theme will be :|

Re: SW8 Construction Discussion

Posted: Sun Aug 06, 2017 8:07 pm
by DeadJack5
Some of my friends visited Friday and shared some photos with me from their visit.

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image


I don't think these photos show much but just some mainly from the rapids exit

Re: SW8 Construction Discussion

Posted: Mon Aug 07, 2017 4:48 am
by Prantel
Is it just me or does the theme structure look like burnt wood? If it does then surely it's going to use smoke and fire effects to simulate going through a burning structure.

Would make for a very intense near miss, fire experience.

Re: SW8 Construction Discussion

Posted: Tue Aug 08, 2017 2:30 am
by darrenhosker
I was thinking the same thing, it looks like burnt timber. Or my first thought was a burnt boat/ship hull.