My fault. You where right. They started with two trains. And the last two were delivered later. :oops:
Greetings!

Yves
AstroDan

Hopefully Wodan will begin with all three trains!

Sent from my Desire HD using Tapatalk
User avatar
Sam
Member
Member
Posts: 4869
Joined: Mon May 05, 2008 7:18 pm
Location: People's Socialist Republic of Sheffield
Contact:

AstwoDan wrote: - There will be toilets integrated within the ride queueline (I haven't heard of this much before!)
Will Wee Faff be the new Shop Faff?  :P
Sazzle

STOP TAKING A (the) PISS!!
Dormiens-Dave

SAM93 wrote: I simply don't think I have ever seen anything as stunning in terms of a coaster in all my life! This thing is absolutely beautiful, words can barely even describe! The theming is just top notch, it has to be some of the best out there, the attention to detail is just fabulous!

It would appear that the whole area, in true Europa Park fashion, does not falter in terms of an immersive experience, not a single detail has gone unnoticed. Now that really is saying something to say that it is still covered in scaffolding and only part way to being totally finished. But boy, once it is, it will look just amazing and will no doubt have a fantastic piece of Europa Park theme music, just to put the icing on the cake!

Roll on the 1st of April I say!

Sublime
Seriously thought this was a Sam G post to begin with :D

Sublime indeed  8)
User avatar
Benedique
Member
Member
Posts: 590
Joined: Tue Nov 17, 2009 2:41 am
Location: Somewhere in the Manchester area

Sam, it could be roll on 31st March. Craig has sensibly suggested that we 'Wodan' (hold on - just incase the pun wasn't obvious, have I ruined it by explaining? Yes... yes I have. Never mind, nothing to see here in these brackets) for everyone else and ride on 1st April though.

P.s the banking next to Blue Fire's loop...  =P~
Image
AstroDan

Local Press are reporting that the final green light has been given for construction to begin in Europa-Park's 2013 development.

The paper, Badische Zeitung, also refers to Arthur and the Invisibles directed by Luc Besson, which is widely touted to be the theme of the new dark ride/coaster combo, located inside the parks Enchanted Forest (Marchenwald) theme area, which was itself new for the 2011 season (or at least, completely overhauled and redeveloped).

The municipal council, meeting in Rust, favoured the development although concerns have been expressed by residents nearby - seen as the Enchanted Forest area literally backs on to residential properties. Some minor amendments have been agreed, although the bulk of the project will be built as planned.

It features:

- Building of size 3,000 square foot.
- New buildings over the River Elz.
- Catering outlet incl. maximum 60 seats (this has been limited by the council)
- Strict noise limits of 48 to 55db during daytime.
- 1.2metre wall/berm to be constructed between the park and the residential area to help with noise.

As previously mentioned, the park also plan to build a small drop tower and carousel for 2013 - in the same area. In case you were not already aware, the ride system for the main 2013 project is believed to be a powered suspended rollercoaster from Mack Rides. This would become Europa-Park's 12th rollercoaster.

Image

:)
Last edited by AstroDan on Wed Feb 15, 2012 5:01 pm, edited 1 time in total.
AstroDan

Construction Update: 15.2.12

First update in over a week following temperatures of up to -20C in recent days...! Anyway, testing should be taking place by the end of February! All three trains are believed to be on site (or arriving iminently!).

Tracking in place on much of the coaster:
Image

Station and Flythrough:
Image

Lift hill with chain space fitted, and roof being built over return section:
Image

Station roof:
Image

Overview:
Image

More images from Chris-Space

:)
Last edited by AstroDan on Thu Feb 16, 2012 3:46 pm, edited 1 time in total.
User avatar
Joe Koopa
Member
Member
Posts: 1538
Joined: Sun Nov 09, 2008 4:01 pm
Location: A small village where Dorset meets Somerset...

Europa using an IP?

I find it slightly hypocritical how people seem to be pleased with this, whereas when Merlin use one uproar over originality concurs.

Still, I'm being optimistic about finally getting to Europa in 2013, and this doses look like it's due to be another great asset to the park.
AstroDan

Joe Koopa wrote: Europa using an IP?

I find it slightly hypocritical how people seem to be pleased with this, whereas when Merlin use one uproar over originality concurs.
Actually, I would say that most people are quite nonchalant about the fact that Europa are using an IP and, following a browse of EP-Board, their fans are generally not positive towards this.

However, the fact remains that this will be an IP. Sadly, we are in an age where most theme parks seem unwilling to take major risks in dark rides that are stand alone.

:(
User avatar
Sam
Member
Member
Posts: 4869
Joined: Mon May 05, 2008 7:18 pm
Location: People's Socialist Republic of Sheffield
Contact:

This seems to be different from most parks that use an IP.

It seems like the highly-celebrated director of the original films will be the creative director of this ride, and will play a major role in how it turns out. It seems like more of a partnership, rather than Merlin just paying to lump in any old IP (Ice Age, CATCF).
Dormiens-Dave

Sam wrote: This seems to be different from most parks that use an IP.

It seems like the highly-celebrated director of the original films will be the creative director of this ride, and will play a major role in how it turns out. It seems like more of a partnership, rather than Merlin just paying to lump in any old IP (Ice Age, CATCF).
Subtitles... "Its not made by Merlin so i like it" :D

Seriously though EP will do a good job IP or not, they always do :)
AstroDan

Sam pretty much has hit the nail on the head. Luc Besson is actually playing a major role in this ride.

:)
Dormiens-Dave

I don't deny it, wouldn't matter if he wasn't EP wouldn't mess up any ride IP or not

.... plus its not made by Merlin
User avatar
Sam
Member
Member
Posts: 4869
Joined: Mon May 05, 2008 7:18 pm
Location: People's Socialist Republic of Sheffield
Contact:

Err no.

I explicitly said my reasons for the unfavourable comparisons to Ice Age at CATCF. If CATCF had Tim Burton in to 'direct' the ride, it would be vastly better. I'm not saying this is better because it's not Merlin, I'm saying it'll be better for the reason I have just very explicitly set out.
Dormiens-Dave

1) My first post was tongue in cheek hence my comment "but seriously" after it.

2) The second post was "my" comment about Merlin, regarding their poor IP record, and had nothing to do with you.

:D
User avatar
BIan
Member
Member
Posts: 485
Joined: Thu Jan 13, 2005 9:40 am

To be fair to Merlin,  I think they did a good job with Saw:The Ride and was CATCF just before Merlin took over.

Ian
AstroDan

Charlie was 2006, Tussauds. It's awful. It all depends on the budget. Charlie was clearly done as cheaply as possible.

I am sure Europa will do a nice job with this. I quite like the film, and Besson is very well respected.

Sent from my Desire HD using Tapatalk
AstroDan

Construction Update: 16.2.12

Panorama from top of lighthouse

At the top of the lighthouse:
Image

Future pool/spa area:
Image

Future bunk beds:
Image

Lighthouse:
Image

Building:
Image

Opens 11 July.

:)
User avatar
Sam
Member
Member
Posts: 4869
Joined: Mon May 05, 2008 7:18 pm
Location: People's Socialist Republic of Sheffield
Contact:

Another blog post about Wodan from the GCI intern:
Pat Slattery wrote:I apologize for the delay since my last post; we had an extremely busy couple of weeks here at GCII. I guess I’ll jump right in and start where I left off.

On January 26, we shipped the remaining nine cars of train 1. The day before the shipping container arrived, each car got strapped down to its custom designed pallet, covered with a blanket, and wrapped in plastic. Then, once the container got here the next day, each car was loaded using the forklift and fastened securely to the floor of the container. I was amazed at how smoothly all of this went- from what I hear, it used to be a far more convoluted and difficult process involving a pallet jack and lots of frustration back in the days before the shop expansion, when GCII didn’t have a loading dock.

After the remainder of train 1 was loaded and gone, train 2 was fully finished before work started on train 3. Train 2 was finished mostly without incident, and was completed on the Friday after train 1 was shipped. This left us one week to build train 3 from the ground up.

The building of Wodan’s third train is one of the most impressive things I’ve ever witnessed or been a part of. It went from completely bare, unchecked chassis on Saturday morning, to a completely finished train by Friday morning… and we didn’t even work that Sunday. That’s just over five working days to assemble a Millennium Flyer from the ground up. Now granted, those were days where we worked 8 AM to 7 PM, but still, it’s really amazing how quickly these trains can come together when all the parts are already here and everything goes smoothly.

After train 3 was finished and mostly wrapped, we had most of a day to get spare parts ready to go. One thing I didn’t realize before I started here was how many spare parts need to be sent for new construction. Since this ride is in Europe, it’s very important to make sure we send a spare part for everything that could conceivably go wrong. It’s also doubly important that we get all of those spares inside the shipping containers with the trains, as a container takes 4-6 weeks to arrive in Europe; if a part is needed and we didn’t send it in the container, it would have to be sent via FedEx, at a cost of up to several thousand dollars.

The day after the trains were finished was a very unique experience for me, as we went to East Coaster, my first ever ACE (American Coaster Enthusiasts) event, and first event as an “official” member of the amusement industry. By complete random chance, we ended up sitting at the same table as Jeff Filicko from Kennywood Park, who a couple years ago gave a behind-the-scenes tour to myself and several others from OSU’s Theme park Engineering Group during the construction of Sky Rocket. It was cool to see all the representatives from various parks at the event showing off their projects for 2012, and fun to meet complete strangers who were as excited about my job as I am.

The next morning, we had a tour scheduled for all the folks who were at East Coaster and wanted to see the GCII shop. However, I had a bit of a problem when I got up in the morning; I woke up, I picked up my glasses off the table next to my bed… and they completely fell apart. Split right in the middle, Harry Potter style. This was a Very Bad thing, because without my glasses I can’t even recognize people’s faces. Driving without them would be completely out of the question. After briefly considering using them as a pair of monocles, I remembered I still had the magnetic sunglasses attachment for them floating around in my car. I found that, knocked the darkened lenses out, and taped it to the remains of my frames to use as structural support. For those of you who were at the tour on Sunday and may have noticed I was wearing badly repaired glasses, this is the reason why.

The shop tour was another unique experience for me. Having toured the GCII shop several times as an outsider, it was interesting and fun to be one of the “insiders.” We had a great turnout of around 50 people- even Dick Knoebel and his son Rick were here! I hope everyone who came to see the facility enjoyed themselves, and I think we all enjoyed giving the tour.

After the tour was over, I luckily found a Wal Mart up in Williamsport (about an hour away) that had the same kind of frames in stock, meaning I could just buy the frames without having to get new lenses, so I drove up and bought them, and made it back in time for kickoff of the Super Bowl.

The next day, Monday the 6th, was the big shipment day. The container for Train 2 was here when we got to the office at 8:00, with the one for Train 3 due around 10:00. Each container had just barely enough room for a full train plus two pallets of spare parts. The process was much the same as it was for Train 1, with each car being loaded with the forklift, facing opposite directions and fitting together like a puzzle. With the cars all loaded in tightly, there’s only a foot or so of width between them for someone to squeeze into and get them screwed to the floor of the container. Somehow, despite being the biggest one at the office, I ended up with this job for both Trains 2 and 3. I’m still not quite sure how that happened, but I got the job done. Both trains were fully loaded and on their way to the Port of Baltimore by 11:30 AM.

To celebrate the completion and shipment of the trains, the whole building crew went out to Longhorn for a steak lunch, where I stuffed myself with a 20 oz Porterhouse steak and a slice of chocolate cake with a scoop of ice cream on top (there’s a reason I’m the biggest one at the office!) The rest of the day was filled with clean up work around the shop, and saying our farewells to Mats, whose flight back to Stockholm left the next morning.

The rest of the week was consumed by taking a full inventory of all our train parts. Theoretically, we should just be able to subtract the parts used on the Europa trains from our previous stock numbers, but just to be safe and to avoid future headaches, a full inventory of every part was taken.

Other than inventory, things haven’t been too busy here since the Wodan trains were shipped. We’ve pulled the chassis out of storage for the Fun Spot America ride that’s being built for 2013 down in Orlando, and have started working on a few various parts for that- I’m gradually realizing that almost as much work goes into preparing to build a Millennium Flyer train as goes into actually assembling it. Otherwise, things have been fairly normal, which in many ways is a welcome change from the craziness of the first five weeks of my internship.