The Smiler - Mobile Game Application
- RollerCoasterTycoon2013
- New Member
- Posts: 12
- Joined: Sun Jan 20, 2013 8:51 pm
- Location: Evesham, England
It's 10:30 now and there's no sign of the gameplay video and Alton Towers seem to have deleted their tweet
- JayJay90
- Member
- Posts: 299
- Joined: Mon Oct 08, 2012 3:21 pm
- Location: Stafford/Wolverhampton
their tweet is still there and just like you I'm sat here waiting. They said theyre showcasing it in the Box Office this morning so I think theyll wait until a good chunk of visitors have arrived before unveiling...hopefully they dont go back on itRollerCoasterTycoon2013 wrote: It's 10:30 now and there's no sign of the gameplay video and Alton Towers seem to have deleted their tweet
- lewis97
- Admin
- Posts: 4374
- Joined: Thu Nov 08, 2012 6:41 am
- Location: Hertfordshire
No, the tweet's still there, and we have an hour and a half left of morning yet, so be patient!RollerCoasterTycoon2013 wrote: It's 10:30 now and there's no sign of the gameplay video and Alton Towers seem to have deleted their tweet
EDIT: Beaten to it!!! Be patient though...
- RollerCoasterTycoon2013
- New Member
- Posts: 12
- Joined: Sun Jan 20, 2013 8:51 pm
- Location: Evesham, England
Ah ok I just got worried because the tweet didn't show up on Twitter on my iPhone.
- Tom_Jephson
- New Member
- Posts: 20
- Joined: Thu Sep 06, 2012 5:54 pm
- Location: Nottingham
refresh....refresh....refresh :whistle:
For a better start in life, start smiling earlier!
- Randomizer462
- Member
- Posts: 96
- Joined: Thu Aug 19, 2010 9:17 pm
- Location: Warwickshire
It's online! -
- Samwise
- New Member
- Posts: 33
- Joined: Thu Nov 08, 2012 3:48 pm
- Location: Manchester
- Contact:
We have our inverted drop!
Wise
- MikeJ
- New Member
- Posts: 12
- Joined: Mon Jan 23, 2012 5:53 pm
And it confirms a corkscrew in to the brake run. That's at least 11 inversions now. Woop.
- danwhit709
- Member
- Posts: 73
- Joined: Mon Aug 27, 2012 8:48 pm
At about 20 seconds in could that be a Zero G Roll??
- lewis97
- Admin
- Posts: 4374
- Joined: Thu Nov 08, 2012 6:41 am
- Location: Hertfordshire
- It confirms:
- Indoor Heartline
- Inverted Drop
- Corkscrew near end
- The Spider is called The Marmaliser
- 'Camel Back to Inline twist' - so another inversion
- What appears to be a zero G roll
Last edited by lewis97 on Thu Feb 21, 2013 11:50 am, edited 1 time in total.
- RollerCoasterTycoon2013
- New Member
- Posts: 12
- Joined: Sun Jan 20, 2013 8:51 pm
- Location: Evesham, England
I just watched the video on my mate's Personal Hotspot. It looks ace!
- PhNx Survivor
- Member
- Posts: 433
- Joined: Sat Nov 17, 2012 11:03 am
- Location: - Unknown -
When it shows the upgrades, you can see in top right, 'top secret'
It also shows the pit is like it is now :\
It also shows the pit is like it is now :\
“A surprise to be sure, but a welcome one”
- Phild94
- Member
- Posts: 324
- Joined: Mon Dec 10, 2012 10:10 pm
- Location: Newcastle under Lyme
The pit will be the least of our worries 10 inversions down the line XDPhNx Survivor wrote: When it shows the upgrades, you can see in top right, 'top secret'
It also shows the pit is like it is now :\
Credit to Lewis97 for the fantastic signature
- Child 'O' Nemmy
- New Member
- Posts: 45
- Joined: Wed Jul 27, 2011 6:51 pm
- Location: Somewhere back in time
Around 00:25 mark, is that confirmation of a duelling element?
- goldengrahams
- New Member
- Posts: 4
- Joined: Thu Jan 31, 2013 2:07 pm
so the 'spider' is the marmaliser . . .
- N3m3s1s
- Member
- Posts: 138
- Joined: Tue Mar 06, 2012 7:48 pm
Ok, so here's my analysis:
We have some pretty standard MOJ imagery at the start. Then, at about 00:08, we get a station shot. Looks quite clinical, yet still manages to incorporate The Smiler logo. Obviously, this is just a game, so things are pretty likely to change/differ. At 00:10, we get a loading screen (?) of sorts, that shows 8 steps. Step 1 (recruitment) is probably just 'recruiting advocates'. Step 2, data capture is also probably just a CCTV of sorts to fit in with the theme. Then, at step 3, we have initiation. Maybe some sort of pre-ride show? Step 4 is very interesting. 'Brain Wipe'. Looks like we will have some sort of brain washing section of the ride. The camera then zooms in on the station, and we see some form of mist curtain (00:14) and a bit of the indoor section. Step 6 is Marmalisation. This is followed by the words 'Prepare for Marmalisation' as we ascend the lift hill. This implies that the actual outdoor section of the ride is what marmalises you, and not a secret element such as the washing machine (if it is in fact part of the ride). Step 7 is smiling advocates, and step 8 is process complete. So, make of this what you will, but this gives us some ideas to the elements that Mr Wardley was talking about. I won't go into track layout too much, because it looks crazy as heck. We get some ride shots, coupled with Dr Kelman and Smiler images, then (at about 00:27), we see and upgrade screen. It shows us that we can obtain/upgrade the following:
-An Indoor heartline
-An Inverted drop
-A Double Batwing
-A Camelback into inline
There also appears to be a seperate section of upgrades for 'Top Secret (element?) and the Marmaliser (Spider), so it looks like it will have numerous features and effects. At 00:39, the train hits the break run, and we get the option to boost. Could this mean that we will have a launch? Anyway, that's what I saw, how about you guys?
EDIT: Some more things that I missed. In the station, there appears to be an elevator on the left, probably for disabled access. Enterprise looks pretty normal, so no MOJ makeover. The station looks slightly different to what I saw in the plans (not architecturally, but aesthetically. Oh, and did I mention that It looks amazing? :moj
We have some pretty standard MOJ imagery at the start. Then, at about 00:08, we get a station shot. Looks quite clinical, yet still manages to incorporate The Smiler logo. Obviously, this is just a game, so things are pretty likely to change/differ. At 00:10, we get a loading screen (?) of sorts, that shows 8 steps. Step 1 (recruitment) is probably just 'recruiting advocates'. Step 2, data capture is also probably just a CCTV of sorts to fit in with the theme. Then, at step 3, we have initiation. Maybe some sort of pre-ride show? Step 4 is very interesting. 'Brain Wipe'. Looks like we will have some sort of brain washing section of the ride. The camera then zooms in on the station, and we see some form of mist curtain (00:14) and a bit of the indoor section. Step 6 is Marmalisation. This is followed by the words 'Prepare for Marmalisation' as we ascend the lift hill. This implies that the actual outdoor section of the ride is what marmalises you, and not a secret element such as the washing machine (if it is in fact part of the ride). Step 7 is smiling advocates, and step 8 is process complete. So, make of this what you will, but this gives us some ideas to the elements that Mr Wardley was talking about. I won't go into track layout too much, because it looks crazy as heck. We get some ride shots, coupled with Dr Kelman and Smiler images, then (at about 00:27), we see and upgrade screen. It shows us that we can obtain/upgrade the following:
-An Indoor heartline
-An Inverted drop
-A Double Batwing
-A Camelback into inline
There also appears to be a seperate section of upgrades for 'Top Secret (element?) and the Marmaliser (Spider), so it looks like it will have numerous features and effects. At 00:39, the train hits the break run, and we get the option to boost. Could this mean that we will have a launch? Anyway, that's what I saw, how about you guys?
EDIT: Some more things that I missed. In the station, there appears to be an elevator on the left, probably for disabled access. Enterprise looks pretty normal, so no MOJ makeover. The station looks slightly different to what I saw in the plans (not architecturally, but aesthetically. Oh, and did I mention that It looks amazing? :moj
Last edited by N3m3s1s on Thu Feb 21, 2013 12:13 pm, edited 1 time in total.
- lewis97
- Admin
- Posts: 4374
- Joined: Thu Nov 08, 2012 6:41 am
- Location: Hertfordshire
Seeing as the 'brain wipe' comes before 'marmalisation', which is the outdoor section of the ride, could that be referencing the SE/World First Feature??? There appears to be screens in the indoor section, which you can see as the train comes back into the station, before boosting, near the end of the video.
- dylan.tempelaars
- New Member
- Posts: 23
- Joined: Sat Feb 16, 2013 1:47 pm
- Location: you shall never know!
the start sugests its out now anyone checked? ma phones dead lol
some people call me insane, you are right!