X Sector Refurbishment

Smile always. New for 2013.
Locked
User avatar
Kenzie2012
Member
Member
Posts: 634
Joined: Wed Feb 29, 2012 5:00 pm
Location: Leeds

If track isn't complete, or if any heavy machinery still needs to get in and out this will not happen. That's the only thing that could stop this idea.... It could work well otherwise.

But, I hope they decide to risk it and just keep it shut.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
User avatar
Rollercoasters4Life
Member
Member
Posts: 112
Joined: Sun Jun 26, 2011 3:34 am
Location: Crewe, Cheshire

Kenzie2012 wrote: If track isn't complete, or if any heavy machinery still needs to get in and out this will not happen. That's the only thing that could stop this idea.... It could work well otherwise.

But, I hope they decide to risk it and just keep it shut.
By March, personally I could see all construction of track finished. This would only leave landscaping, paving, theming, electrics and testing. Which I would presume some of it would already be under way, especially the electrics..
Image
User avatar
Kenzie2012
Member
Member
Posts: 634
Joined: Wed Feb 29, 2012 5:00 pm
Location: Leeds

Right, so what I've just said there is "IF" any of that is left.
I too would very much hope all the big stuff is done... Lets say we turn into Antarctica for another 3 weeks though, that really isn't going to happen.... Even the slightest delay could push things back enough to mean I the spider let say is still being placed come opening week which will no doubt means cranes and transport vehicles all over the place.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
User avatar
Liam-AltonTowers
Member
Member
Posts: 425
Joined: Wed Jun 06, 2012 5:14 pm

Hang on a minute, does this mean the X-Sector will be open from March till May or will it be closed along with The Smiler construction. Also when do you think the Enterprise replacement will be finished by?
Image

Credit to Lewis97, thanks for the amazing signature!
User avatar
Sam198
Member
Member
Posts: 695
Joined: Wed Oct 24, 2012 9:15 pm

Liam-AltonTowers wrote: Hang on a minute, does this mean the X-Sector will be open from March till May or will it be closed along with The Smiler construction. Also when do you think the Enterprise replacement will be finished by?
Enterprise would go up in 2 days...

We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
User avatar
Liam-AltonTowers
Member
Member
Posts: 425
Joined: Wed Jun 06, 2012 5:14 pm

X-Sector not been open will put people off going to Alton Towers between March to May.
Image

Credit to Lewis97, thanks for the amazing signature!
User avatar
Kenzie2012
Member
Member
Posts: 634
Joined: Wed Feb 29, 2012 5:00 pm
Location: Leeds

I disagree completely Liam, I don't think it will make a huge amount of difference.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
User avatar
Owen
Member
Member
Posts: 2552
Joined: Tue Mar 20, 2012 5:25 pm
Location: South East

Sam198 wrote:
Liam-AltonTowers wrote: Hang on a minute, does this mean the X-Sector will be open from March till May or will it be closed along with The Smiler construction. Also when do you think the Enterprise replacement will be finished by?
Enterprise would go up in 2 days...

We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
What do you mean by "would go up in 2 days" I don't understand
Image
User avatar
Kenzie2012
Member
Member
Posts: 634
Joined: Wed Feb 29, 2012 5:00 pm
Location: Leeds

The Enterprise is a very easy ride to build.... That can be rebuilt and up ready for testing in to days of work.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
User avatar
Boz
New Member
New Member
Posts: 0
Joined: Fri Feb 28, 2014 12:29 am
Location: Farnborough, Hampshire

Enterprise takes 1 day to put back together (if you know what you're doing), and a further day to test. Trust me it's the least of X-sectors problems ;)
User avatar
Benji
Member
Member
Posts: 244
Joined: Sat Sep 01, 2012 12:40 pm

I would expect this would add a possible 5 minutes maximum onto all the other big roller coasters in the park, if X-sector isn't open
Image

Thanks to Lewis for the sig!
User avatar
Sam198
Member
Member
Posts: 695
Joined: Wed Oct 24, 2012 9:15 pm

thillmad wrote:
Sam198 wrote:
Liam-AltonTowers wrote: Hang on a minute, does this mean the X-Sector will be open from March till May or will it be closed along with The Smiler construction. Also when do you think the Enterprise replacement will be finished by?
Enterprise would go up in 2 days...

We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
What do you mean by "would go up in 2 days" I don't understand
Enterprise is a travelling model, it's designed to be put up and taken down with ease. This one is currently in a far more deconstructed state than would usually be necessary in order to allow for transportation; however it still really wouldn't take very long at all.
User avatar
Owen
Member
Member
Posts: 2552
Joined: Tue Mar 20, 2012 5:25 pm
Location: South East

Sam198 wrote:
thillmad wrote:
Sam198 wrote: Enterprise would go up in 2 days...

We really don't know if X-Sector will remain open during this time or not, but I would presume it won't...
What do you mean by "would go up in 2 days" I don't understand
Enterprise is a travelling model, it's designed to be put up and taken down with ease. This one is currently in a far more deconstructed state than would usually be necessary in order to allow for transportation; however it still really wouldn't take very long at all.
I understand this,but I mean 2 days from now or was this just an estimate
Image
User avatar
Sam198
Member
Member
Posts: 695
Joined: Wed Oct 24, 2012 9:15 pm

Oops, My bad. It was an estimate of how long it would take to be fully erected. (if Alton felt the need to do it as fast as possible) ;)
User avatar
sque132
New Member
New Member
Posts: 1
Joined: Mon Dec 10, 2012 2:56 pm
Location: Cambridge
Contact:

Hi first post on here 

seen all the images AT have recently posted...
is there any word on the Enterprise re-theme? Wouldn't it be amazing if it contained a similar colour scheme to the smiler!
I'd love it to look like one of the spirals/eyes in the logo! Just a thought
Born This Way Ball 08/09/2012 :)
User avatar
samham
New Member
New Member
Posts: 16
Joined: Mon Nov 26, 2012 7:14 pm

sque132 wrote: Hi first post on here 

seen all the images AT have recently posted...
is there any word on the Enterprise re-theme? Wouldn't it be amazing if it contained a similar colour scheme to the smiler!
I'd love it to look like one of the spirals/eyes in the logo! Just a thought
I love this idea!  :D
User avatar
Kenzie2012
Member
Member
Posts: 634
Joined: Wed Feb 29, 2012 5:00 pm
Location: Leeds

Thats a good idea, but i really hope they don't do it.
Something like that is going to spoil the feel of the area, the flats are there to be subtle additions to back up the big rides and the area. Putting some form of decoration on Enterprise will start to turn the area into Smiler-Ville.
Last edited by Kenzie2012 on Tue Jan 22, 2013 12:26 am, edited 1 time in total.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
User avatar
scw55
Member
Member
Posts: 307
Joined: Tue Jul 17, 2012 1:41 pm

So a giant spiral on the wheel which various users have suggested before, would be over-kill?
User avatar
Kenzie2012
Member
Member
Posts: 634
Joined: Wed Feb 29, 2012 5:00 pm
Location: Leeds

Yeah i think so.... keep it nice and simple.

Black, Black, Black with Grey Cars and possibly a big of green lining those Cars.


This is all.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
User avatar
Boz
New Member
New Member
Posts: 0
Joined: Fri Feb 28, 2014 12:29 am
Location: Farnborough, Hampshire

I disagree, personally I think it would look fantastic to have the spiral on there. although TBH, I don't see it happening (would love to be proved wrong though) :)
Locked