Nemesis - Has it been left to rot?
- phillipvass
- Member
- Posts: 223
- Joined: Tue Jul 20, 2004 9:37 pm
- Location: At home
Now I know this coaster is suppose to look like it's been bashed about a bit, but i think now it's starting to suffer from neglect, the path was so much better when it wound around, now the fence to that it rusting away and overgrown, and the nemesis monster itself is looking a bit tatty. Also the blood river isn't working, I hope Alton get these problems fixed in the near future, and bring back the nemesis that I remember
Last edited by phillipvass on Tue Jun 28, 2005 8:19 pm, edited 1 time in total.
- spinwhizzer
- Member
- Posts: 200
- Joined: Sun Dec 28, 2003 12:11 pm
- Location: Australia
Yes I agree its a shame! Hopefully they will do something about it soon, but if htey do it wont be a big tidy up, maby a station re-paint. I doubt we will ever see the waterfalls working again!
- richardlerwill3
- New Member
- Posts: 33
- Joined: Wed Oct 06, 2004 10:27 pm
Nemesis looked awful in 2004, it certainly needs doing up. It's considered one of the best themed coasters in the world, yet Alton Towers don't seem to care, they haven't been looking after it well at all when it certainly needs it.
While Nemesis IS supposed to look a bit rough and ready...there are very obvious differences between this being simulated and it actually being real neglect...and I think perhaps AT have started to...errr 'believe' Nemesis' own hype about it being such a great coaster and perhaps left it to its own devices in some aspects. The litter everywhere, chipped paintwork, dirty station (inside and out), chewing gum is EVERYWHERE on the monster and of course, the defunct river of blood. It needs a good clean-up and fix-up to restore it to the Nemesis we know, love and miss!
:P
:P
- loop_the_loop
- New Member
- Posts: 27
- Joined: Sat Dec 04, 2004 10:50 pm
- Location: Buckie....in Bonnie Scotland
- Contact:
A good general tidy up, bit of painting, steam cleaning and plastic re-moulding of certain parts of the beast would improve it a lot. And I only wish that they have cut down the bush that overgrows into the queue line from the entrance of the now non-used extra queue system (just before the station entrance).
.........Chance favours the prepared mind..........
- phillipvass
- Member
- Posts: 223
- Joined: Tue Jul 20, 2004 9:37 pm
- Location: At home
I think there needs to be a bin outside, just before you enter the monster, that's where most of the chewing gum and crap is. I think 2004 should of been it's best year, rather than it's worst seeing as it was ten years old It saddens me to see it as it is
- stokywolf
- Member
- Posts: 1933
- Joined: Wed Jan 21, 2004 6:38 pm
- Location: Liverpool
- Contact:
Well i think the rivers wil lwork again maybe because it has been on a different topic :P :P
But the state of the nemesis building is a shame.
But the state of the nemesis building is a shame.
Tavern hall of famer - rockerz my sockerz
- Xx Rita xX
- New Member
- Posts: 40
- Joined: Thu Dec 16, 2004 2:09 pm
- Location: In front of my computer, though I wish I was on AIR !
- Contact:
Yep Blood waterfalls are going to be working next year, Nemmy monster is getting a re-paint, new queue's for single riders. All will be good for Nemesis in 2005 season.
- SW-Dave
- Member
- Posts: 875
- Joined: Mon Jun 13, 2005 1:21 am
- Location: YOU
- Contact:
i seem to be in a minority here, obviosly the cleaning of litter and chewing gum would be good, But i personally think that nemesis just gets better with age, I thinbk the rusted fences and overgrown abandonned paths look great, as well as the now dull paintwork.
A tidyup would be good, but the weathered, neglected and somewhat appocolyptic look is good IMO
A tidyup would be good, but the weathered, neglected and somewhat appocolyptic look is good IMO
- Beaver Dude
- Member
- Posts: 814
- Joined: Mon Jun 13, 2005 3:26 pm
- Location: Farnborough
Um it was sorted out already the monster was repainted (and I hear the rest of it'll get a repaint for 2006) and it's still pretty tidy.
- plasticboy
- Member
- Posts: 449
- Joined: Tue Jul 26, 2005 2:22 pm
- Location: Cannock, Staffordshire
The monster was painted for the 2005 season. If you mean you wish the track was painted, then yes i agree. I also wish all the large weeks growing out of the sides of the rocks were removed. Some say that it makes it look good, nut i dont. Nemesis will look more like a Garden Centre if it isnt sorted out. lol.it just needs a re-paint
- Beaver Dude
- Member
- Posts: 814
- Joined: Mon Jun 13, 2005 3:26 pm
- Location: Farnborough
You obviously don't know much about weeds. If you pull them out they'll be back the next day.
- Kenzie2012
- Member
- Posts: 634
- Joined: Wed Feb 29, 2012 5:00 pm
- Location: Leeds
Thought I'd bring this back into play....
As you can see, 6 1/2 years ago the general thoughts were that Nemmy was suffering from fatigue and of course neglect.
I think it's an all round observation now that the most popular ride on park has been left to rot away again ( and others too) It's falling apart..... I'm massively confused to why they would let this happen after the " king Nemesis" result last year.
I know it all boils down to budgets and cash, but how can they let this happen???? Really???
Thoughts from you guys - and any pictures woulda be good. I've not managed to get any of the areas that need work yet tbh.
As you can see, 6 1/2 years ago the general thoughts were that Nemmy was suffering from fatigue and of course neglect.
I think it's an all round observation now that the most popular ride on park has been left to rot away again ( and others too) It's falling apart..... I'm massively confused to why they would let this happen after the " king Nemesis" result last year.
I know it all boils down to budgets and cash, but how can they let this happen???? Really???
Thoughts from you guys - and any pictures woulda be good. I've not managed to get any of the areas that need work yet tbh.
"Life is a waste of time, and time is a waste of life. Get wasted all the time, and you'll have the time of your life!”
- The Psychoaster
- Member
- Posts: 202
- Joined: Sun Oct 02, 2011 12:06 am
- Location: Manchester
Merlin seem more concerned with investing in new rides rather than renovating older ones, which although is obviously a very good thing - does leave a lot of classic AT rides looking rather tired. To be honest I'd rather have an Oblivion repaint before Nemesis - it's looking awful these days whereas at least the rust on Nemesis can be attributed partly to the theming.
- roary01
- Member
- Posts: 310
- Joined: Sun Jun 21, 2009 9:46 pm
- Location: Staffordshire
I think i have to disagree here, im beginning to get bored of the "the rust/rundown look can relate to the theme" in Nemesis case the track is fine, that isn't the problem, but how many alien monsters are covered in moss, falling apart, peeling paint, layers of mould/slime (not slime relating to monsters either)...The Psychoaster wrote: Merlin seem more concerned with investing in new rides rather than renovating older ones, which although is obviously a very good thing - does leave a lot of classic AT rides looking rather tired. To be honest I'd rather have an Oblivion repaint before Nemesis - it's looking awful these days whereas at least the rust on Nemesis can be attributed partly to the theming.
It is now gettin to the point where its needing work quite soon as it will get to the point where parts have to be totally replaced because of the time its been left without TLC... but at the end of the day Merlin will have to foot a bigger bill to repair it then..
Whereas although oblivion now is grey instead of black, i can just tolerate it, but in terms of the station exterior, its beginning to get like Nemesis and also needs work.
Truth is i don't see Merlin doing ANY repairs to either until something actually falls off the station/becomes unsafe...