Towers Loving Care

General discussion regarding the UK's No.1 Theme Park. Talk about anything and everything Alton Towers here.
Post Reply
User avatar
Dungeon-X-Smile
Member
Member
Posts: 229
Joined: Sat Jul 18, 2015 5:20 pm
Location: Ministry of Joy

Yeah!! I love the idea of the monorails being themed to the Big 6 (soon big 7). It'd bring the park full circle a little more and it'd just be awesome. It would also make a great talking piece when entering the park and create some hype (which would make much more sense than jelly beans... can someone pls explain to me why that's a thing?)

I know this is going back a little, but I think it's really important for Alton Towers to keep Duel. I'll be the first to admit I'm one for history over new, but with everyone racing towards virtual reality (such as the ghost train), I feel it's important to keep some rides physical. There should be variety! I think that towers love and care could do a really good job at reviving old effects and simply keeping it going, cause soon in the future, when everything is VR this and that, we'll all be wanting physical tricks again. And this is why it's important that towers love and care deal with it instead of simply ripping it out and starting from scratch. 
User avatar
Zach
Member
Member
Posts: 804
Joined: Sun Jul 08, 2012 11:53 am

saw-x-smile wrote:I know this is going back a little, but I think it's really important for Alton Towers to keep Duel. I'll be the first to admit I'm one for history over new, but with everyone racing towards virtual reality (such as the ghost train), I feel it's important to keep some rides physical. There should be variety! I think that towers love and care could do a really good job at reviving old effects and simply keeping it going, cause soon in the future, when everything is VR this and that, we'll all be wanting physical tricks again. And this is why it's important that towers love and care deal with it instead of simply ripping it out and starting from scratch. 
Coming to the End of the season, TLC is becoming prominent again as Duel has been targeted (see what I did there) for a re-vamp this closed season. Now I don’t think it’s going to be a major over haul but I have to agree with S-x-S here, physical tricks and sights work well, theming, space and darkness are what makes Duel work well. Hopefully with re-vamp and re-fresh rather complete change Duel can once again be something fantastic, perhaps with a few new scares and sounds in there to keep public interest up. 
Image
User avatar
jackf1tz
Member
Member
Posts: 263
Joined: Tue Aug 01, 2017 10:18 pm
Location: Near Mutiny Bay

Ha! Re-VAMP!
User avatar
Ripsaw Raver
Member
Member
Posts: 573
Joined: Sun Jul 29, 2007 2:50 pm
Location: Beeston ,Nottingham
Contact:

Im still hoping Sub Terra will find a place under TLC there are ways of making the ending scary/jumpy without actors, Think Krake-Lebt , Well time animatronics and strobes.It would be very sad to see Sub Terra SBNO for yet another year
User avatar
Justin
Member
Member
Posts: 2703
Joined: Thu Apr 17, 2014 2:51 pm

Image

The gates have closed, the water from Congo River Rapids has been drained and the smoke machine has been turned off on Rita. The 2017 season is now over, which means one thing... Towers Loving Care.

Returning for the third year, the TLC team will be making improvements to Duel this winter, but watch this space for even more updates.  I for one will be looking forward to the updates provided by the resort, but while we wait; what realistically would you like to see improve?
User avatar
MakoMania
Member
Member
Posts: 1612
Joined: Fri Feb 20, 2015 10:29 am
Location: Who knows?

The Smiler queue line, please just sort out The Smiler queue line. Needs improved drainage, repainting and bins need to be installed. Looked like a junk yard at Scarefest.
SeaWorld has rescued over 35,000 animals in need![/i]
User avatar
S.J_O'Grady
Member
Member
Posts: 454
Joined: Wed Oct 08, 2014 10:14 pm
Location: Shropshire, England

-Theming back on River Rapids roof
-Sub Terra ready to reopen with improvements
-The Smiler queue line
-Tidy up some Battle Galleons theming
-I would say CCL but it needs far more than TLC
Life is a roller coaster. You can either scream every time you hit a bump or you can throw your hands up in the air and enjoy it.
User avatar
Capt.Barnacles
Member
Member
Posts: 616
Joined: Thu Nov 22, 2012 7:19 pm
Location: Stoke-on-Trent

The bins were removed from The Smiler's queue line earlier this season, unofficially to do with the heightened threat of attack on the country at the time. They were never completely put back but a few were placed back in towards the end of the season. The queue is cleaned at the beginning and end of every day by the hosts of the ride, any mess you saw would have generated on the same day.
Much of the ride track/stanchions had paint touch ups during the LAST winter season, so I highly doubt it'll be any priority for this one. Take the rainbow staircase for instance. The only way that's staying visible and looking good is if its cleaned at the end of every single day. I promise you that is the last thing on any of the rides teams minds at the end of a day of dealing with guests. 
As for the drainage, this can't really be changed/upgraded easily at this point. It would require significant removal of fencing in the queue to access areas where the drainage channels are, or cutting fresh grooves in the concrete which would have a potential risk of severely damaging the now secure foundations for the ride stanchions. At the end of the day, that water can be easily swept away once the queue is empty.
Image
Image
User avatar
Dan
Member
Member
Posts: 2339
Joined: Tue Jun 23, 2009 9:08 pm

Capt. Barnacles wrote:The bins were removed from The Smiler's queue line earlier this season, unofficially to do with the heightened threat of attack on the country at the time. They were never completely put back but a few were placed back in towards the end of the season. The queue is cleaned at the beginning and end of every day by the hosts of the ride, any mess you saw would have generated on the same day.
Much of the ride track/stanchions had paint touch ups during the LAST winter season, so I highly doubt it'll be any priority for this one. Take the rainbow staircase for instance. The only way that's staying visible and looking good is if its cleaned at the end of every single day. I promise you that is the last thing on any of the rides teams minds at the end of a day of dealing with guests. 
As for the drainage, this can't really be changed/upgraded easily at this point. It would require significant removal of fencing in the queue to access areas where the drainage channels are, or cutting fresh grooves in the concrete which would have a potential risk of severely damaging the now secure foundations for the ride stanchions. At the end of the day, that water can be easily swept away once the queue is empty.
Sorry Dan but The Smiler on the whole is in such a state (it really pains me to say it such is my love for it)

The station building needs a good jetwash (as does the queue line); you can hardly tell the track/supports were touched up last winter as within a month they looked awful again; the second tv over the vertical lift needs re-installing; the marmaliser needs its effects fixing (bulbs out on the Flasher and the Tickler being stationary most of the time); the strip lighting on the stairs up to the station needs fixing and they need to turn the area music up again.

I’m sure there’s more that needs doing to it but that’s just a few things off the top of my head. Annoyingly you’re right about the drainage issue, that was just shoddy design and execution from the word go but it still doesn’t make puddle-hopping any better.
Image
User avatar
Capt.Barnacles
Member
Member
Posts: 616
Joined: Thu Nov 22, 2012 7:19 pm
Location: Stoke-on-Trent

Oh don't get me wrong, by all means I agree the ride is in an awful state, it's just sad to think that there are reasons for believing that Merlin won't make it a priority this time round :(
Image
Image
User avatar
Justin
Member
Member
Posts: 2703
Joined: Thu Apr 17, 2014 2:51 pm

The complete queue line certainly needs cleaning with a pressure washer at least. Ideally, the drainage should be sorted too, but in general, The Smiler still needs work as it feels tired. As Dan mentioned, the vertical lift hill screen has been missing all season and the effects on the Marmaliser need some TLC. Although work was done inside the station building, there is still more to be done. It is still my No 1 coaster, but it would be nice to see some time invested in it. 

X-Sector is an area which needs small adjustments though. For me taking down the hoardings in X-Sell would be a quick fix, ideally with a shop or at a push more arcade machines. I also think a little more theming is needed around the area, including the reintroduction of edited entrance boards. Oblivion's queue line also needs work with a little more theming.
User avatar
lewis97
Admin
Admin
Posts: 4374
Joined: Thu Nov 08, 2012 6:41 am
Location: Hertfordshire

The restoration of the Pagoda Fountain was completed just before the end of the season, and CTD architects, the company who completed the project, have recently updated their website with details of the works they carried out, as well as some photos from throughout the process and a video of it fully functioning (which you may have seen on TowersTimes Facebook this evening).

Image

Image

Image

Image

Image
User avatar
Justin
Member
Member
Posts: 2703
Joined: Thu Apr 17, 2014 2:51 pm

It is certainly restored to its formal glory. Great to see that Alton are investing in the gardens (even if advised).
User avatar
Dungeon-X-Smile
Member
Member
Posts: 229
Joined: Sat Jul 18, 2015 5:20 pm
Location: Ministry of Joy

I'm so glad that this was restored! It looks so beautiful. I always find the little buildings within the gardens magical when I see them!
User avatar
Robert.W
Member
Member
Posts: 1200
Joined: Fri May 12, 2017 12:38 am

Towers Street yesterday posted pictures from around the theme park, one showing some work being carried out on Nemesis' station.
https://mobile.twitter.com/TowersStreet/status/939901804325818368
Image

Image
Image
User avatar
Justin
Member
Member
Posts: 2703
Joined: Thu Apr 17, 2014 2:51 pm

The Towers Loving Care Facebook page has posted for the first time, this year, with more updates planned from tomorrow!
Towers Loving Care wrote: Happy New Year everyone! Sorry we’ve been so quiet, we’ve been busy doing tons of Towers Loving Care projects all over the Resort! We will start posting about them tomorrow with pictures and magical info but for now here’s a tiny teaser of what’s to come...✨
Image
User avatar
TheDuke
Member
Member
Posts: 204
Joined: Mon Dec 19, 2016 8:38 pm

Justin wrote:The Towers Loving Care Facebook page has posted for the first time, this year, with more updates planned from tomorrow!
Towers Loving Care wrote: Happy New Year everyone! Sorry we’ve been so quiet, we’ve been busy doing tons of Towers Loving Care projects all over the Resort! We will start posting about them tomorrow with pictures and magical info but for now here’s a tiny teaser of what’s to come...✨
Image
Woo it begins!
User avatar
Dan
Member
Member
Posts: 2339
Joined: Tue Jun 23, 2009 9:08 pm

The Towers Loving Care Facebook page has posted an update on the restoration project currently taking place on the Grand Garden Conservatory.

The Grand Garden Conservatory completed c.1820
Designed for Charles Talbot the 15th Earl of Shrewsbury by Robert Abraham

This Grade II listed building forms part of the important layout and garden composition at Alton Towers and is architecturally significant. This restoration project cost alone is in excess of £1 million which is part of a continual investment programme we are very proud of here at the Alton Towers Resort.
Found on top of one of the shallower domes and central to the structure of it there is a colourful red pine cone surrounded by vivid green acanthus leaves. It’s actually made of stone and its weight and placement means the cast iron glazing bars around the central boss don't move an inch.The colours are informed by the landscape architect and specialist architectural paint analysis and evidence found when preparing the stonework. Acanthus are most seen in the Mediterranean so may have hinted at what was being grown inside, or that acanthus leaves often are used to represent long life and immortality. Either way, the beautiful restoration work undertaken on this feature was well worth the time and workmanship. More to follow soon...
Image
Image
User avatar
S.J_O'Grady
Member
Member
Posts: 454
Joined: Wed Oct 08, 2014 10:14 pm
Location: Shropshire, England

And I thought it was a strawberry.  :|
Life is a roller coaster. You can either scream every time you hit a bump or you can throw your hands up in the air and enjoy it.
User avatar
Justin
Member
Member
Posts: 2703
Joined: Thu Apr 17, 2014 2:51 pm

Or a remodeled acorn from Ice Age. :D

In all seriousness, the Towers are part of what makes the resort, therefore it is very important for restoration to continue. The history should be preserved for future generations.
Post Reply