Wicker Man - General Discussion

General discussion regarding the UK's No.1 Theme Park. Talk about anything and everything Alton Towers here.
Post Reply
User avatar
Justin
Member
Member
Posts: 2703
Joined: Thu Apr 17, 2014 2:51 pm

The best way will be down past Towers Trading (left hand side of Towers Street), inbetween Battle Gallons and Courtyard and around. The other way is through Mutiny Bay but it may be blocked off. You also have rides to contend with. :)
User avatar
Dan
Member
Member
Posts: 2339
Joined: Tue Jun 23, 2009 9:08 pm

It seems Wicker Man’s reliability gremlins have struck again today, as the ride has not yet opened. The queue line and ride area audio has been turned off, and while the ride was testing this morning, this too has stopped.

I really hope Towers and/or GCI manage to fix the issue that seems to be plaguing the ride at the moment, as its inconsistent operation is somewhat dampening the initial hype surrounding the ride.
Image
User avatar
MakoMania
Member
Member
Posts: 1612
Joined: Fri Feb 20, 2015 10:29 am
Location: Who knows?

Indeed, the hype is vanishing quickly.
SeaWorld has rescued over 35,000 animals in need![/i]
User avatar
Michelle
Member
Member
Posts: 1232
Joined: Sat Jan 19, 2013 7:32 pm
Location: North West

I don't think it's quite so drastic as that, all the non enthusiasts on my Facebook are super excited to ride and probably won't visit for a while when hopefully all the teething problems will be sorted. I think it's important not to overstate the drama on this, the ride is great and Alton are trying to get it sorted, while enthusiasts may be a bit frustrated most of the GP will get over it or barely even notice as they aren't monitoring it every day. I'm optimistic they'll get it sorted soon enough.
User avatar
Dan
Member
Member
Posts: 2339
Joined: Tue Jun 23, 2009 9:08 pm

Michelle wrote:I don't think it's quite so drastic as that, all the non enthusiasts on my Facebook are super excited to ride and probably won't visit for a while when hopefully all the teething problems will be sorted. I think it's important not to overstate the drama on this, the ride is great and Alton are trying to get it sorted, while enthusiasts may be a bit frustrated most of the GP will get over it or barely even notice as they aren't monitoring it every day. I'm optimistic they'll get it sorted soon enough.
Oh I agree :)

I’m still really hyped to ride it, I’m just a little nervous about my visit on Thursday as I just want it to be open :lol
Image
User avatar
MakoMania
Member
Member
Posts: 1612
Joined: Fri Feb 20, 2015 10:29 am
Location: Who knows?

I mean, of course there is still some excitement, but headlines like this aren't great:

https://www.birminghammail.co.uk/news/m ... f-14454217

More of an enthusiast thing, but with the park in such poor shape this year, it's making it really hard for me to be excited about Wicker Man, which is a shame as it's a good attraction.
SeaWorld has rescued over 35,000 animals in need![/i]
User avatar
Morgan
Member
Member
Posts: 1594
Joined: Tue Sep 02, 2014 12:22 pm
Location: Altonville Mines

The ride has reopened according to ride times, with a 2hr queue.
User avatar
Robert.W
Member
Member
Posts: 1200
Joined: Fri May 12, 2017 12:38 am

Which ride are we talking about here? riderimes.co.uk still says that Wicker Man and Nemesis are not available, same also for Congo River Rapids and Heave Ho..
Image

Image
Image
User avatar
Morgan
Member
Member
Posts: 1594
Joined: Tue Sep 02, 2014 12:22 pm
Location: Altonville Mines

Was Wicker Man, must've closed again!
User avatar
Robert.W
Member
Member
Posts: 1200
Joined: Fri May 12, 2017 12:38 am

Ahh, it's back open now, queues at 90 mins..
Image

Image
Image
User avatar
lewis97
Admin
Admin
Posts: 4374
Joined: Thu Nov 08, 2012 6:41 am
Location: Hertfordshire

It would seem that the Rollercoaster Restaurant is now home to a miniature model of Wicker Man, which was apparently created as part of Merlin's internal approval process as per this tweet.

Image
User avatar
Justin
Member
Member
Posts: 2703
Joined: Thu Apr 17, 2014 2:51 pm

I'll have to take a look at that, later this week!
User avatar
ponder
Member
Member
Posts: 567
Joined: Tue Jun 09, 2009 2:38 pm
Location: Nr Colchester, Essex
Contact:

I'm struggling to understand why a GCI woody with a fairly straight forward lay-out is having so many technical issues. You can understand it with new tech (like with Air), but it seems a bit baffling that they're having so many issues with this.
User avatar
DeadJack5
Member
Member
Posts: 776
Joined: Sun Mar 25, 2012 8:15 pm
Location: :sus:
Contact:

ponder wrote:I'm struggling to understand why a GCI woody with a fairly straight forward lay-out is having so many technical issues. You can understand it with new tech (like with Air), but it seems a bit baffling that they're having so many issues with this.
Apparently it is overshooting, every time it does this the system is tripped and has to restart again. This is why they are sending around empty trains so often because they need to reset the system. I maybe be wrong but this is what I've been told by staff.
User avatar
Nickolai
Member
Member
Posts: 503
Joined: Sun Jul 17, 2016 5:36 pm
Location: Lincolnshire

Hopefully we don't get trims.........
Image
Formally Smiler313
User avatar
Jack
Member
Member
Posts: 1206
Joined: Sun Dec 09, 2012 9:16 pm
Location: Solihull

For it to need trims it'd need to be overshooting the brake run, and luckily it isn't doing that ;)
Image
User avatar
Phild94
Member
Member
Posts: 324
Joined: Mon Dec 10, 2012 10:10 pm
Location: Newcastle under Lyme

What exactly is it overshooting? The lift hill? Surely some trim brakes before it wouldn’t impede the ride top much
User avatar
Dan
Member
Member
Posts: 2339
Joined: Tue Jun 23, 2009 9:08 pm

Phild94 wrote:What exactly is it overshooting? The lift hill? Surely some trim brakes before it wouldn’t impede the ride top much
It’s rumoured to be overshooting the station and parking incorrectly. This would cause the ride to shut down as the control unit would think two trains are occupying the same block.
Image
User avatar
Phild94
Member
Member
Posts: 324
Joined: Mon Dec 10, 2012 10:10 pm
Location: Newcastle under Lyme

Dan wrote:
Phild94 wrote:What exactly is it overshooting? The lift hill? Surely some trim brakes before it wouldn’t impede the ride top much
It’s rumoured to be overshooting the station and parking incorrectly. This would cause the ride to shut down as the control unit would think two trains are occupying the same block.
That’s odd, surely it would only be pushed into the station at a set speed. Unless of course it is that the brakes are not holding it adequately... either way this isn’t the sort of mistaken an experienced manufacturer should be making
User avatar
ATI
Member
Member
Posts: 55
Joined: Mon Dec 05, 2016 6:14 pm
Location: Lancashire, England, UK

If this is the case, I think it's a first for GCI. Maybe this also ties into the fact the layout was only designed to utilise 2 trains, but the park opted for 3. 
We were born to fly...
Post Reply